Calamity

πŸ‡ΊπŸ‡Έ United States Risk Assessment

Max CFI Score

76

high

Risk Rating

E

score 95.0

Operational Status

red

The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.

Risk Assessment by Hazard Type

HazardScoreLevel
fire76high
river flood45elevated
flood42elevated
weather42elevated
disease39moderate
drought38moderate
earthquake36moderate
volcano34moderate
air quality31moderate
tsunami16low