πΊπΈ United States Risk Assessment
Max CFI Score
76
highRisk Rating
E
score 95.0
Operational Status
red
The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.
Risk Assessment by Hazard Type
| Hazard | Score | Level |
|---|---|---|
| fire | 76 | high |
| river flood | 45 | elevated |
| flood | 42 | elevated |
| weather | 42 | elevated |
| disease | 39 | moderate |
| drought | 38 | moderate |
| earthquake | 36 | moderate |
| volcano | 34 | moderate |
| air quality | 31 | moderate |
| tsunami | 16 | low |