Calamity

🇵🇹 Portugal Risk Assessment

Max CFI Score

47

elevated

Risk Rating

A

score 12.0

Operational Status

green

The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.

Risk Assessment by Hazard Type

HazardScoreLevel
fire47elevated
weather40elevated
air quality33moderate
flood27moderate
earthquake16low