Calamity

🇪🇹 Ethiopia Risk Assessment

Max CFI Score

74

high

Risk Rating

D

score 61.0

Operational Status

red

The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.

Risk Assessment by Hazard Type

HazardScoreLevel
fire74high
flood38moderate
air quality27moderate
earthquake16low